Skip to main content

Reply to "Field Renovation Question"

When I have seen infields rebuilt, the first step is to nail drag the existing infield then carefully remove all extra material (e.g. weeds, rocks etc.).

Then add about two inches of new material and nail drag that again so as to mix with the layer below.

Drag it to make it level, shooting with a laser level.

Roll it (ideally with a steam roller type machine)

Add another inch and nail drag to mix, drag, level and repeat until you are up to the proper level.

What you want to avoid is having layers built up where there is a hard division between layers - this will give you all kinds of drainage problems in the future.
Last edited by 08Dad
×
×
×
×