Re getting a laser level - ask your league parents - someone has to be a contractor. These days nearly all general contractors have a laser level. I know our local high school talked a dad into helping out with this over two weekends (when the work was being done) in exchange for a free advertising sign in the outfield.

Another option would be a local college if they have a surveying / engineering program. The students are usually out measuring the quad twelve ways to sunday - they should be able to shoot a baseball field instead. Talk to the department chair and he can point you to the right professor.

Re the grass, how long will you be able to keep people off of it? You will need probably a good 6-8 weeks before roots are established enough to take cleats.